Kitchen Remodeling · Olathe KS
Kitchen Remodel in Olathe, KS
Olathe is full of good homes built in the last thirty years, and a lot of those kitchens are ready for their second act. We design and build kitchens for how you actually cook and gather, then hand you one licensed crew and a price you can hold us to. No runaround, no three contractors with three different numbers.


We are based right next door in Overland Park, so Olathe is a town we work in week in and week out. We know the floor plans out in Cedar Creek, Boulder Creek and Prairie Farms, and the newer builds off Woodland and Ridgeview. A lot of them share the same story: a kitchen that was fine for a builder in 2003 and feels tight and dated now that the family actually lives in it.
That is the work we love. Opening a wall so the kitchen finally talks to the family room, swapping tired oak boxes for cabinetry built for how you store things, and giving you counters that take a beating and still look good on a Sunday. If you are weighing a bigger project, our kitchen remodeling overview walks through how we work, and plenty of Olathe clients pair a kitchen with a finished basement in the same year.
The Short Answer
What a kitchen remodel costs in Olathe
Nearly every kitchen we build drops into one of three buckets. Yours depends on a handful of things. Does the current layout suit how you cook, or do you fight it every night? How many of the cabinets are you really swapping out? How far do you want to push the finishes before you flinch at the total? The ranges below are what our own Olathe and Johnson County kitchens have actually run. Not a tidy national figure off somebody's chart.
| Project type | Our typical range | What it includes |
|---|---|---|
| Cosmetic refresh | $18,000 to $35,000 | New counters, backsplash, paint, hardware and lighting. Your cabinets and layout stay put. |
| Mid-range remodel | $40,000 to $75,000 | All new cabinets in the same footprint, quartz counters, flooring and appliances. |
| Full gut remodel | $70,000 to $120,000+ | Walls move, a new layout goes in, custom cabinetry, premium counters and higher-end appliances. |
Ranges reflect real Reimagined Remodeling kitchen projects in the Olathe area, not a bid. Your exact number comes from a free walkthrough.
Ballpark Your Project
Olathe Kitchen Remodel Cost Estimator
A quick, honest range based on real Olathe-area kitchens we have built. It is a starting point, not a bid. Your free line-item quote comes within one business day of a walkthrough.
What is the scope?
Finish level
Add features
Estimated Investment
$38,000 to $62,000
New cabinets, same footprint · Signature finish
Get My Exact QuoteBallpark only. Every kitchen is different, so we confirm your real number after a free walkthrough.
Where the Money Goes
What drives your Olathe kitchen remodel cost

Cabinets, first and loudest. If one line from this page sticks, make it this one. Stock to semi-custom to full custom is a gap that can run into the tens of thousands all by itself, before a counter or an appliance is even in the room.
Counters come down to what you pick. Laminate, a quartz slab, a real stone slab. Three different conversations, three very different invoices.
Anything that touches plumbing, gas or wiring moves the number too. Scoot the sink across the room or push the range to a new wall and you have just added a trade and another Olathe inspection to sit and wait on.
Taking out a wall is its own line item. Now you are into framing, a beam if it turns out to be load bearing, and new drywall before one finish goes up.
Appliances are the part nobody budgets for honestly. The jump from a builder-grade package to a pro range with a real hood is bigger than people expect.
Then the boring stuff that still costs money. The permit, the dumpster in the driveway, the plastic and paper that keep your floors and hallway alive through demo. We put all of it on the quote up front rather than letting it jump out at you in week three.
How Long It Takes
Your Olathe kitchen remodel timeline
Walkthrough and design
2 to 4 weeks
We come out to your Olathe home, measure, and draw it up. Cabinets, counters and finishes all get locked down before anybody picks up a hammer, and you see the plan first.
Demo and rough-in
1 to 2 weeks
The old kitchen comes out in a hurry. Plumbing, gas and wiring get reset for the new plan, then the Olathe inspector signs off before we move on.
Cabinets, counters, tile
3 to 5 weeks
Boxes hang first. Counters get templated, then installed a week or two later once they are fabricated. Backsplash and flooring follow behind.
Finish and punch list
1 to 2 weeks
Appliances in, trim and paint done, then a walkthrough where you and Dave go looking for anything that is not quite right before we call it finished.
Once your selections are locked, most Olathe kitchens run six to twelve weeks on site. The thing setting the pace is almost always the custom cabinetry, so we order it early and build the whole schedule backward from the day it is due to land.
Plan the Whole Home
More than a kitchen
Plenty of our Olathe clients start in the kitchen and keep going. If you want the full picture of how we work, the kitchen remodeling overview lays it out. You can see what we do with a bathroom remodel, or how we turn an empty lower level into a finished Olathe basement. When the timing is right, the contact page is a short step away.
FAQ
Olathe kitchen remodel questions, answered
Begin
Let's price the Olathe kitchen you'll never want to leave.
Tell us about your project. We respond within one business day with a clear next step. no pressure, no scripts.